Wednesday, May 6, 2009

Second Floor!



The roof trusses are next, but with all the wet weather this week they may be delayed.

Go Postal said there was about a 1/4" of rain water on the second floor. It was slowly dripping through the seams in the sheathing. All the second floor space will be now available for storage and he may decide to add a few more windows down the left side so there will be more light up there. Its exciting to watch the progress.